menu

NASA Tournament Lab

 34,243

The Trash-to-Gas Ash Management Challenge

Help NASA develop an ash removal process for a trash-to-gas reactor that helps space travel be more sustainable.

This challenge is closed

stage:
Won
prize:
$30,000

This challenge is closed

more
Summary
Timeline
Updates13
Forum32
Teams395
Press
Resources
FAQ
Summary

Overview

One of the challenges of long duration space exploration is waste management.   As waste streams are generated, unwanted trash items begin to accumulate in the cabin. During long duration missions, this aggregates into several tons of trash being stored inside the habitat, which makes orbital maneuvers more expensive and reduces the amount of habitable volume for the crew.  NASA is taking a multi-pronged approach to waste management on long-duration spacecraft (see Waste to Base Materials Challenge: Sustainable Reprocessing Space and NASA Waste Jettison Mechanism Challenge). Three primary approaches are currently being investigated to help solve the problem with space trash: 

  1. Thermally degrade the waste via a process called Trash-to-Gas. This approach gasifies the waste items, producing water and syngas which can be reutilized onboard or vented overboard for mass and volume reduction.
  2. Dry, stabilize, and compact the trash items. This approach removes the water from the trash, reduces trash volume, and produces trash tiles that may be effective for radiation protection. However, another method of removing the trash mass from the spacecraft is still required in conjunction with this approach.
  3. Jettison the trash via an airlock. This approach removes all of the trash mass and volume from the habitat but may not recover any of the resources within the discarded trash items.

This challenge will help support the development of the first approach, Trash-to-Gas. Trash-to-gas reactors are considered a sustainable approach to both near- and long-term waste management during long-duration space missions.  The primary goal of this challenge is to create actionable design concepts for ash removal from a trash-to-gas reactor in microgravity.

A trash-to-gas reactor uses thermal degradation processes to gasify waste into a product that can be vented or repurposed as raw material for other spacecraft processes. Figure 1 depicts a high-level Trash-to-Gas process that will be utilized on future long-duration missions.  Several products can be recovered from the trash reactor, including gas, water and solids. One of the solid by-products will be ash. This ash must be removed regularly, just like ash needs to be removed from a fireplace or grill. The ash removal step has not yet been designed for a space trash reactor.  In Figure 1, the two dotted lines express the potential to either remove the ash by-products directly from the reactor or immediately after the reactor but before the ‘Post-Processing & Recovery” stage. Modifications to the existing reactor design are sought that will allow ash to be regularly and safely removed in microgravity conditions.

Figure 1: Trash-to-Gas Process Diagram 

 

This challenge has a total prize purse of $30,000 and will recognize the top three design concepts with first, second, and third prizes of $15,000, $10,000, and $5000 respectively.  


Guidelines

 

Background

Trash-to-Gas is the process of thermally degrading astronaut trash items into gaseous products to be reused as functional commodities or vented overboard for mass and volume reduction benefits. Combustion, using oxygen and heat to convert trash into mainly carbon dioxide and water, has been demonstrated in microgravity at a sub-scale level. At a full-scale level, such a system will be capable of reducing the mass and volume of trash onboard long-duration space habitats while producing usable commodities such as water, oxygen, carbon dioxide, methane, and hydrogen. The Trash-to-Gas process is a sustainable trash management solution currently being developed by NASA, recovering resources from various trash items that include metabolic, biological, inorganic, and logistical solids (plastics, clothing, foam packaging, etc.). The Trash-to-Gas process also minimizes the concerns with trash disposal in orbit and on planetary surfaces; gas venting does not produce orbital debris and decreases planetary protection risks on the surface (microbial growth on disposed trash items). Several Trash-to-Gas publications are referenced in the Resources tab for more detail.

The state of the art Trash-to-Gas system is the Orbital Syngas/Commodity Augmentation Reactor (OSCAR). OSCAR has flown on two suborbital flights via Blue Origin’s New Shepard launch vehicle, demonstrating key functionality in microgravity at the sub-scale level.  Now that trash combustion in microgravity has been successfully demonstrated, NASA aims at developing a full-scale system for use on future long-duration crewed missions. The removal of ash from a reactor is imperative to this next phase of development. As waste items will be continuously processed through the reactor on a daily basis, residual ash by-products will begin to accumulate in the reactor, leading to reactor fouling and eventual inoperability of the system. Thus, the goal of this challenge is to design an effective method of removing ash from a full-scale trash-to-gas reactor in microgravity and to safely store it for later use or disposal. The residual ash can be potentially repurposed into other useful mission needs or vented overboard to reduce mass for fuel cost savings. A basic CAD model of the current trash-to-gas reactor is shown in Figure 2.

 

Figure 2: Basic Trash-to-Gas Reactor CAD Model.  Reactor full assembled (top), reactor with lid removed (bottom)
 
Figure 2: Basic Trash-to-Gas Reactor CAD Model.  Reactor full assembled (top), reactor with lid removed (bottom)
 

If you’ve ever had to remove ash from a fireplace or a grill, you know that this can be a messy process.  Ash is not a very homogeneous material, and sudden movements can cause the finer particulates to linger in the air.  Now imagine you are doing this in a spacecraft in microgravity, where ash will not settle to the ground.  Not only is this messy and inconvenient, it is also potentially hazardous to both the crew and equipment.  Ideally, the ash removal system would be integrated seamlessly into the trash reactor or trash processing system, and would be automated - or require minimal human operation.

In the current concept of operations, the reactor will run in a batch-mode, with an average daily ash production of about 540gm. This residual solid, or ash, will also include inorganic compounds or metals (such as aluminum from the food packaging).   The ash will be fully contained within the reactor after each batch run.  You may assume the reactor will be intermittently 'baked out', or brought to temperatures >500°C, between ash removal steps to further clean the system.

 

For this effort, please assume while the majority of the ash is loosely packed, some may also be stuck to the reactor walls. If you have ideas for how to process ash to further reduce its volume, we are very interested in learning more about them.  More information about ash composition and consistency can be seen below. Ash composition will vary greatly due to the wide variety of input trash materials. The ash removal solution should be capable of removing ash with varying particle sizes, densities, and compositions. 

Table 1: Trash-to-Gas Ash Specifications

Figure 3: Image of Trash-to-Gas Ash using Scanning Electron Microscopy with Energy Dispersive Spectroscopy (SEM/EDS) - 1mm scale

When the reactor is in operation, oxygen is injected during the combustion process to convert trash into gas as effectively as possible. The gas composition primarily includes oxygen, carbon dioxide, water vapor, and carbon monoxide. These gaseous products will vary in concentration due to changes in input trash composition and completeness of combustion. Trace amounts of larger hydrocarbons and other volatile organic compounds (VOCs) will also be produced. VOCs that are likely to be present within the product gas stream include acrolein, acetaldehyde, benzene, toluene, furan, and acetone, produced at ppm concentrations within the reactor volume.

 

Use the basic reactor model in Figure 2 as a starting point for your design.  Modifications to the reactor are encouraged to meet the needs of your ash removal solution but should not inhibit combustion operations.   Your design concept for ash removal may be integrated into the reactor itself or occur just prior to the post-processing and recovery steps (see Figure 1).  Your ash removal strategy must incorporate storage of removed ash for up to one day.  The stored ash will then be moved on a daily basis to a longer term storage area.  Disposal of stored ash is not part of this challenge.

The design concept must:

  • Accommodate the critical interfaces to the combustion chamber, such as trash inlet, oxygen inlets, and gas outlet.
  • Allow ash to be removed and stored on a daily basis, at minimum (assume an ash production of 540 gm/day and a density of 300-500 kg/m3).
  • Prevent gaseous combustion products from entering the cabin air
  • Allow for periodic opening of the combustion chamber for manual cleaning purposes of the interior surfaces.
  • Be ready for operational deployment within 0-3 years
  • Provide durable and safe ash storage, while adding minimal mass and volume to the ash itself.
  • Remove no less than 90% of the ash by-products from the system each day of operation
  • Be operable within the microgravity environment

Performance specifications of any proposed ash removal and collection system:

  • Occupies a volume no larger than 700 in3, or roughly 12 L (which is about the size of an average shoe box)Note that the volume can be occupied in any form factor.
  • Adds no more than 10 kg to the trash-to-gas system.
  • Consumes no more than 500W at peak power.
  • Able to tolerate temperatures up to 1000°C for parts interfacing directly with the reactor.
  • Accommodates up to 30 PSIG during reactor operation and cannot cause higher pressures within the reactor.
  • Compatible with a 100% O2 environment (at the listed pressures and temperatures)
  • Generates noise levels below 50 decibels.  Brief or intermittent noise in the range of 50-80 decibels is acceptable.
  • Minimizes the amount of ash that may get introduced into the cabin (ideally none). If ash particles are introduced into the cabin, particles can be no larger than 250 µm.

NASA is interested in effective solutions that are simple and effective at removing these ash constituents from the reactor on a regular, or at least daily basis. The microgravity environment poses several challenges to seemingly trivial processes on Earth.  Simple, elegant approaches that are automated and can be demonstrated in the near-term are preferred.  Also, minimization of crew time for reactor maintenance is crucial. Thus, solutions that both clean interior walls of the reactor while removing the loose ash from within would be most favorably reviewed. 

Possible approaches include technologies adapted for operation in a microgravity environment, such as:

  • Cyclone filters
  • Technologies that use a pressure differential to move ash
  • Technologies that use forced gas to move ash
  • Plasma processing

APPROACHES NOT OF INTEREST

  • Any system dependent on gravity for transferring/handling ash
  • Any system which cannot meet the energy consumption target
  • Any system which depends on a large number of consumables (i.e. frequent filter exchange)

Prize

NASA will award the three most compelling design submissions first, second, and third prizes of $15,000, $10,000, and $5000.

In addition to the cash awards, winners will have an opportunity to present their design concepts to a panel of NASA scientists, engineers, and/or project managers.

It is NASA’s intent to prototype winning technologies and assess their relative merits within the next 1-3 years.

Prize

Award

First place

$15,000

Second place

$10,000

Third place

$5,000

Total Prize Purse

$30,000 USD

Timeline

Open to submissions March 3, 2022

Submission deadline May 12, 2022 @ 5pm ET

Judging May 12 - June 16, 2022

Winners Announced June 23, 2022

How do I win?

To advance through pre-screening and be eligible for an award, your proposal must, at minimum:

  • Meaningfully complete all fields of the submission form.
  • Thoughtfully address the submission form prompts.

Responsive solutions will:

  • Clearly and concisely describe the design and its operation
  • Provide a strong design rationale
  • Include a high level design drawing

Competitive solutions will additionally:

  • Include a detailed design file or CAD file
  • Provide a bill of materials (BOM) for design implementation
  • Provide high-level mass, power, and volume estimations for the ash removal and storage solution
  • Use as many commercial-off-the-shelf (COTS) parts as possible and provide respective part numbers (ie McMaster-Carr part numbers)
  • Address how the base reactor design will need to be modified to accommodate the ash removal capability
  • Address ease of routine maintenance

Judging Criteria

Section DescriptionOverall Weight
Feasibility

Will it work

Does it meet the volume, mass and power constraints

Operates in microgravity

35
Operations

Ease of implementation and integration

Operations are largely automated

Maintenance is minimal and/or easy to accomplish

Standardized parts (ease of maintenance)

25
SafetyWill it protect the crew and cabin environs from accidental ash discharge and other hazards25
Technical MaturityCould it be prototyped and tested within 0-3 years15

 

Rules

Participation Eligibility:

The Prize is open to anyone age 18 or older participating as an individual or as a team. Individual competitors and teams may originate from any country, as long as United States federal sanctions do not prohibit participation (see: https://www.treasury.gov/resource-center/sanctions/Programs/Pages/Programs.aspx). If you are a NASA employee, a Government contractor, or employed by a Government Contractor, your participation in this challenge may be restricted.

Submissions must originate from either the U.S. or a designated country (see definition of designated country at https://www.acquisition.gov/far/part-25#FAR_25_003), OR have been substantially transformed in the US or designated country prior to prototype delivery pursuant to FAR 25.403(c). 

Submissions must be made in English. All challenge-related communication will be in English.

You are required to ensure that all releases or transfers of technical data to non-US persons comply with International Traffic in Arms Regulation (ITAR), 22 C.F.R. §§ 120.1 to 130.17.

No specific qualifications or expertise in the field of mechanical sensors is required. NASA encourages outside individuals and non-expert teams to compete and propose new solutions.

To be eligible to compete, you must comply with all the terms of the challenge as defined in the Challenge-Specific Agreement.

Intellectual Property

Innovators who are awarded a prize for their submission must agree to grant NASA a royalty-free, non-exclusive, irrevocable, worldwide license in all Intellectual Property demonstrated by the winning/awarded submissions. See the Challenge-Specific Agreement for complete details.

You may be required to complete an additional form to document this license if you are selected as a winner.

Registration and Submissions:

Submissions must be made online (only), via upload to the HeroX.com website, on or before May 12, 2022 at 5pm ET. No late submissions will be accepted.

Selection of Winners:

Based on the winning criteria, prizes will be awarded per the weighted Judging Criteria section above.

Judging Panel:

The determination of the winners will be made by HeroX based on evaluation by relevant NASA specialists.

Additional Information

  • By participating in the challenge, each competitor agrees to submit only their original idea. Any indication of "copying" amongst competitors is grounds for disqualification.
  • All applications will go through a process of due diligence; any application found to be misrepresentative, plagiarized, or sharing an idea that is not their own will be automatically disqualified.
  • All ineligible applicants will be automatically removed from the competition with no recourse or reimbursement.
  • No purchase or payment of any kind is necessary to enter or win the competition.
  • Void wherever restricted or prohibited by law.
Timeline
Updates13

Challenge Updates

Announcing The Winners For Trash To Gas

June 16, 2022, 2 p.m. PDT by Adam Olsen

NASA Tournament Labs has selected the following winners to share in the $30,000 final prize of the Trash To Gas Challenge. The winners are:

 

1st Place ($15,000):

Aurelian Zapciu - "Ash evac with auger screw fed by acoustic pressure"

 

2nd Place ($10,000):

Wu Steven - "ASEAR - Automated Sonically Enhanced Ash Removal"
 

3rd Place ($5,000):

Miko de Meijer - "Brachistochronic Impeller & Forced Air Loop Filter"

 

Honorable Mentions:

Alex Altshuler - "CHAMBER CENTRIFUGE WITH AXIAL SCRAPER."

Xiaoshan Lin - "Zero-ash automated cyclone separator system"

 

Thank you to everyone for your participation in this challenge. There were some incredible submissions that made the judging process very difficult. 

 

HeroX will be in touch with the winners for next steps.


8 Hours Remaining to Submit!

May 12, 2022, 6 a.m. PDT by Lulu

If you're still assembling your submission, you have exactly 8 hours left to complete it! 

Here's a Tip: HeroX recommends innovators plan to submit with at least a 3-hour window of time before the true deadline. Last-minute technical problems and unforeseen roadblocks have been the cause of many headaches. Don't let that be you!


Two Day Warning

May 10, 2022, 9 a.m. PDT by Lulu

This is your official two-day reminder!

That's right, the Trash-to-Gas Ash Management Challenge will be closing this coming May 12th at 5pm Eastern Time (New York/USA).

Please be sure to complete your submission form well before the exact cut-off time. 

At exactly 5 pm ET, we can no longer accept new submissions! 

Got questions?

Now is the time to speak up! Comment directly on this update with any questions about the submission process and we'll get back to you right away! 


Five Days Left to Submit (TIPS)

May 7, 2022, 9 a.m. PDT by Lulu

We are quickly approaching the final days open for submission to the Trash-to-Gas Ash Management Challenge. The deadline is May 12th at 5pm Eastern Time (New York/USA.) 

Here are a couple of last-minute tips for a smooth entry process:

1. Begin your submission process several days before the cutoff time. This allows you to ensure everything you have been working on can be seamlessly integrated into the form.

2. Your submission will not be reviewed until you click the orange "Submit Entry" button at the top of the final review page. Please remember to do this! 

3. Review the Challenge Guidelines to ensure your submission is complete. Pay particular attention to the judging criteria which will be the scorecard used to evaluate your entry.

4. Have any questions? Head over to the challenge forum and we would love to help you out. 

Thanks so much, and good luck to all!


One Week Left to Submit

May 5, 2022, 9 a.m. PDT by Lulu

There's exactly one week left to submit your solution to the Trash-to-Gas Ash Management Challenge! 

You're so close. You can do this!  

Remember, the final submission deadline is May 12th at 5pm Eastern Time (New York/USA). No submissions received after this time will be accepted, so make sure to get yours in as soon as possible. Any last-minute questions or concerns can go right in the comments section of this update.

GOOD LUCK!


Forum32
Teams395
winners
JustRQ's team JustRQ's team
2 team members
Looking for members
POB-RT-29 POB-RT-29
2 team members
Looking for members
Aarit Grover's team Aarit Grover's team
1 team member
Looking for members
MASTERMINDs MASTERMINDs
2 team members
Looking for members
Eyad Elsheshtawy's team Eyad Elsheshtawy's team
1 team member
Looking for members
Aryan Shreeraj's team Aryan Shreeraj's team
1 team member
Looking for members
Xiaoshan Lin's team Xiaoshan Lin's team
2 team members
Looking for members
la terre poirs la terre poirs
1 team member
Looking for members
SpaceSquad (SS) SpaceSquad (SS)
3 team members
Looking for members
Mars Colony X: Trash to Gas Mars Colony X: Trash to Gas
4 team members
Looking for members
Omnitrix_24bdn Omnitrix_24bdn
2 team members
Looking for members
P•V=n•R•T P•V=n•R•T
1 team member
Looking for members
Rocket Rangers Rocket Rangers
2 team members
Looking for members
CAELESTIS CAELESTIS
1 team member
Looking for members
The Hyper Group The Hyper Group
2 team members
Looking for members
Austere Engineering's team Austere Engineering's team
1 team member
Looking for members
Guillermo Ramirez's team Guillermo Ramirez's team
1 team member
Looking for members
Huskies Huskies
2 team members
Looking for members
Space Glades Space Glades
1 team member
Looking for members
ZGGCMS ZGGCMS
2 team members
Looking for members
#TEAMTABAHI #TEAMTABAHI
4 team members
Looking for members
Krishn Arora's team Krishn Arora's team
2 team members
Looking for members
Mohammad Rafet's team Mohammad Rafet's team
1 team member
Looking for members
Someshwar Thakare's team Someshwar Thakare's team
1 team member
Looking for members
Litesh Aniruth's team Litesh Aniruth's team
1 team member
Looking for members
Atlas Space Corp. Atlas Space Corp.
1 team member
Looking for members
ridho fermana kusuma's team ridho fermana kusuma's team
1 team member
Looking for members
Hrinkar Mishra's team Hrinkar Mishra's team
1 team member
Looking for members
C O S M I C C O S M I C
1 team member
Looking for members
The raging lion Ayman al-Ghurair The raging lion Ayman al-Ghurair
1 team member
Looking for members
Extreme Engineering Extreme Engineering
3 team members
Looking for members
John Watson's team John Watson's team
1 team member
Looking for members
Food Team, Inc Food Team, Inc
1 team member
Looking for members
B-Inspired Tecknolowgies B-Inspired Tecknolowgies
1 team member
Looking for members
Save Earth Save Earth
1 team member
Looking for members
Crointel Crointel
2 team members
Looking for members
Press
Resources
FAQ